Heating gas boiler Buderus 24 kW: design of a single-circuit device, as well as operating instructions and reviews


Istrinsky district, KP "Istrinsky Plyos", complex of engineering systems

Technical task:

Complete set and installation of heating, water supply, sewerage systems in a private house with an area of ​​550 m2.

Result:

The boiler room in the cottage village "Istra Plyos" is made using the most modern equipment and materials: the heat source in this case is a cascade installation consisting of gas floor-standing boilers Buderus Logano G234 WS (RU TOP)

, total power 110 kW. To prepare hot water we use a boiler from the Belgian manufacturer ACV Comfort series; pumping and mixing modules from the German manufacturer Huch EnTEC ensure efficient circulation of coolant through radiator heating systems and water-heated floors, as well as water supply to four bathrooms and laundries located on the first, second and ground floors of the building. A Rosinox stainless steel chimney was installed, Reflex expansion tanks, a Watts safety group, and Framco dirt removers were installed. The wiring throughout the house and the water heated floor system are made with Rehau Stabil and Rautherm S pipes, the radiator heating is equipped with steel panel radiators from the German manufacturer Kermi, our company’s specialists installed 37 radiators of various types and sizes, as well as several installations from the manufacturer Geberit.

Shchelkovsky district, KP "Verezhki-2", heating of townhouses with a total area of ​​more than 550 m2


Technical task:

Separate heating and water supply for 2 twin townhouses using original equipment from leading European manufacturers, incl. Buderus automation, which allows you to remotely control the boiler room from anywhere in the world using a mobile application.

Result:

As the main boiler equipment we use a wall-mounted condensing gas boiler Buderus Logamax plus GB162

with a power of 70 kW, with a coaxial pipe exiting to the roof of the building, an indirect heating boiler from the Belgian manufacturer ACV of the Smart Line series with a volume of 240 liters was used to prepare hot water, which has a patented “tank-in-tank” technology - as a result, we are able to heat a larger amount of water in a shorter period time. To circulate the coolant through the system, we use pumping and mixing modules with Grundfos pumps, a manifold and a hydraulic separator made of German main components and assemblies made of copper, as a result we obtain a reliable, but at the same time compact system with increased productivity and heat transfer. The wiring throughout the house was made using Rehau Rautitan stabil pipes; when completing the water-heated floor system, pipes from the Swedish manufacturer Uponor were used; the radiator heating system was represented by panel steel radiators from the manufacturer Kermi.

Why do you piping a boiler?

The design of a double-circuit gas wall-mounted boiler requires mandatory piping.

The piping of a gas wall-mounted boiler is carried out in order to increase the service life of the system, as well as to ensure that the equipment does not overheat.

Thanks to the strapping, the room quickly warms up to a comfortable temperature, which is maintained for the required time. The most relevant piping is for solid fuel gas boilers. Timely installation of a wall-mounted double-circuit solid fuel gas boiler can completely replace expensive gas heating.

Piping a wall-mounted double-circuit gas boiler is a cost-saver and a way to effectively distribute thermal energy.

Correct piping of a wall-mounted double-circuit gas boiler 2

Novogorsk, DSK "Lad", a complex of engineering systems in a cottage with an area of ​​350 m2


Technical task:

Turnkey installation of heating, water supply and sewerage systems, installation of a boiler room and chimney.

Result:

A heating and water supply system was installed for a private house with an area of ​​350 m2 in Khimki, Moscow region, Novogorsk district. The boiler room is mounted on the basis of a floor-standing atmospheric boiler Buderus Logano G234 WS (RU TOP)

, with a power of 55 kW, standard automatic control MC110 and automatic expansion TECH i3, which allows you to control three heating circuits, as well as remote control of the boiler from anywhere in the world. Pumping and mixing modules, manifold and hydraulic separator manufactured by Huch EnTEC, Reflex expansion tanks, Itap shut-off valves, piping of main components and assemblies with Viega copper. The heating system consists of several circuits of a water-heated floor made of Rehau Rautitan pink pipes of 16 and 20 diameters, Kermi panel radiators, and Grota manifold cabinets. The water supply and sewerage system was installed using Uponor aqua pipes and rehau rautitan his.

Connecting a Buderus wall-mounted boiler

The peculiarity of wall-mounted boilers is that it is, as they say, a boiler room in miniature. Inside one housing are the boiler itself and the hot water supply circuit, sometimes together with a small storage tank, a circulation pump and, of course, automatic control. Sometimes a small expansion tank is also placed inside. Naturally, all these nodes are combined and connected to each other already at the factory. But nevertheless, the boiler itself still needs to be correctly and reliably connected to the gas, chimney and pipes of the heating and hot water circuits. All connection operations are described in the installation instructions, and theoretically can be performed independently if you have the necessary skills. But do not forget that during the initial connection and commissioning you will still need to have an agreement in hand with a certified installation organization.

Chekhov district, KP “Brilliantovy Bereg”, heating and water supply of a private house with an area of ​​220 m2


Technical task:

Complete set and installation of all main utilities: boiler room, radiator/convector heating, water heated floor, water supply and sewerage.

Result:

An example of the production of a full range of work on HVAC systems, using the highest quality materials and modern equipment: the heart of the house’s engineering is the boiler room, made on the basis of the Buderus Logano G124 boiler (RU TOP)

with a power of 24 kW, equipped with a remote control system for heating circuits, a boiler from the Belgian manufacturer ACV of the SmartLine series was used to prepare hot water, pumping and mixing modules from the German manufacturer Huch EnTEC, Reflex expansion tanks, a domestically developed Shtil inverter stabilizer were installed, and a Rosinox chimney system was installed. The heating system is represented by water heated floors based on Rehau Rautherm S 17 pipes, convectors from the manufacturer Varmann installed in the window sills, as well as panel radiators from the German manufacturer Kermi.

Setting up and adjusting Buderus boilers

All heating units require regular balancing and adjustment of parameters. In most cases, a full range of such work is performed during boiler servicing. However, there are situations when unscheduled adjustments are required. For example, after an emergency stop, with a decrease in productivity, with repeated errors generated by automation or after upgrading the system.

Our center’s specialists are ready to carry out both one-time adjustments of your heating unit and take it for long-term maintenance. We are authorized to work with the entire Buderus model range, and our craftsmen have all the necessary licenses and certificates.

Boiler adjustment includes activities such as: warming up; checking the chimney and safety automation; control and debugging of the ventilation system, fuel supply and electrical network. We provide an official guarantee for all types of work.

For additional information on all types of services provided by our center, you can call our 24-hour hotline or come to our office.

READ How to connect kss to html

Rublevo-Uspenskoe highway, Borki village, boiler room in a private house with an area of ​​300 m2


Technical task:

Complete set and installation of a boiler room in a private house, based on a wall-mounted condensing boiler.

Result:

In addition to the condensing wall-mounted boiler Buderus Logamax plus GB172i

with a power of 42 kW, a Protherm electric boiler with a power of 9 kW is installed in parallel, capable of providing a house of 300 m2 with a positive temperature in the event of a complete shutdown of gas, even during winter frosts. To prepare hot water, an indirect heating boiler from the Belgian manufacturer ACV of the Smartline series is installed; circulation of the coolant through the heating system is provided by pumping and mixing modules, a manifold and a hydraulic separator from the German manufacturer Huch EnTEC. The boiler circuit piping is made of Viega copper, Reflex expansion tanks are installed, a Watts safety group is installed, and products from the Italian manufacturer Itap and the German Oventrop are used as shut-off valves.

Connection and commissioning of the Buderus Logomax U072 boiler

Connecting the Buderus Logamax U072 boiler

— The Buderus Logomax U072 24k boiler is supplied with a connected mains cable without a plug.

— Install a suitable plug on the mains power cable

— Connect the cable tightly to the distributor.

— If the wire is not long enough, disconnect it.

— If the boiler is connected in a protection zone, then disconnect the wire and use wire type NYM-I 3 x 1.5 mm2.

Connecting an on/off regulator or an Open-Therm regulator

— The boiler can only be operated with a Bosch regulator.

— The regulator must be designed for mains voltage (from the heating boiler) and must not have its own grounding.

— Contacts for connecting the regulator to the control unit are located under the cover.

— Remove the jumper on the TH terminals.

— Connect the regulator to the VT terminals.

To connect the power cable, you need to open the control unit.

— Disconnect the ignition wire.

— Disconnect the old power cable.

— Insert the plug of the new wire on the electronic board.

— Insert the wire clamp into the housing.

— Install the housing cover.

— Connect the ignition wire.

Putting the Buderus Logamax U072 boiler into operation

1-Drain hose, 2-Heating return valve (optional), 3-Cold water valve (optional), 4-Gas valve (closed) (optional), 5-Hot water, 6-Heating flow valve ( additional equipment), 7-Button “Return” (exit the service function/submenu without saving), 8-Button “ok” (confirm selection, save value), 9-Display, 10-Automatic air vent, 11-Button “+” , 12-Button “–” (mode), 13-Button “Stand-by”, 14-Pressure gauge, 15-Filling device

Before putting the Buderus Logomax U072 boiler into operation:

— Set the pre-pressure in the expansion tank in accordance with the static height of the heating system.

— Open the automatic air valve (leave it open).

— Open the radiator shut-off valves.

— Open the cold water tap (Fig. 4).

— Open the hot water tap and keep it open until water flows from it.

— Open the taps of the heating supply and return lines.

— Remove air from the radiators.

— Fill the heating system again to a pressure of 1-2 bar.

READ How to connect Wi-Fi to Nokia Asha 305

— Check whether the type of gas indicated on the nameplate corresponds to that available in the gas supply system.

— Adjustment of the rated thermal load according to TRGI is not required.

— Open the gas tap.

— Insert the power plug into the socket: the boiler goes into stand-by mode.

Rice. 5. Display readings

1-Burner operation, 2-Fault display/stand-by display, 3-Heating mode active, 4-Hot water heating active, 5-Summer mode active, 6-Service mode, 7-Temperature display (in ° C)

Setting up gas supply (natural and liquefied gas)

— Fold the control unit down.

— Hang the control unit below on the boiler so that you can simultaneously adjust the gas fittings and work with the control unit.

— To ensure heat transfer, open the radiator valves or the hot water tap.

Rice. 6. Gas fittings for the boiler Buderus Logamax U072 24/18

1-Measuring fitting (pressure at the nozzles), 2-Adjusting screw for maximum gas flow, 3-Cover, 4-Adjusting screw for minimum gas flow, 5-Fitting for measuring the supplied gas pressure

Gas pressure at the injectors at maximum thermal power

— Call service function 1.2.F and set operating mode 04 (maximum heating output).

— Unscrew the sealing screw of the pressure measuring fitting on the injectors and connect a U-shaped pressure gauge.

— Set the pressure on the injectors using the maximum gas flow adjusting screw.

Checking the network gas pressure

— Turn off the Buderus Logomax U072 24k boiler and close the gas valve, disconnect the U-shaped pressure gauge and tighten the sealing screw.

— Unscrew the sealing screw on the fitting for measuring the gas supply pressure and connect the pressure gauge.

— Open the gas tap and turn on the unit.

— Call service function 1.2.F and set operating mode 04 (maximum heating output).

Checking and maintaining the Buderus Logamax U072 boiler

Cleaning the burner tray, nozzles and sit burner

— Unscrew the five screws and remove the combustion chamber cover forward and upward.

— Remove the injector rod.

— Clean the burner with a soft brush to make sure there is no contamination on the lamellas and nozzles. Never clean the injectors with a wire brush.

— Check for contamination of the electrodes, clean or replace if necessary.

— Check gas supply settings.

Checking the expansion tank

When checking the expansion tank annually, you must:

— Relieve the pressure in the Buderus Logamax U072 24k/18k boiler.

— If necessary, set the pre-pressure of the expansion tank in accordance with the static height of the heating system.

Removing the hot water temperature sensor

— Open the hot water tap.

— Use a screwdriver to lift up the hot water temperature sensor.

Source

Pushkinsky district, KP "Green edge", a complex of engineering systems for a private house with an area of ​​400 m2


Technical task:

Complete set and installation of all major engineering systems: boiler room, heating, water supply, sewerage, chimney.

Result:

All major engineering systems were designed and installed for a private house in the Pushkinsky district. The boiler room is made using a floor-standing atmospheric boiler Buderus Logano G234 (RU TOP)

with a power of 55 kW, an indirect heating boiler from the ACV SmartLine series with a volume of 160 liters is responsible for the preparation of hot water. Thanks to the patented “tank in tank” technology, water heating is carried out much faster and more efficiently than with boilers from other manufacturers. The project provides for a heating system based on radiators and water-heated floors throughout the entire area of ​​the building. Steel panel radiators from the manufacturer Kermi were chosen as heating devices. The collector water supply circuit ensures uniform flow of water through all plumbing fixtures. To implement this project, Rehau brand pipes and fittings, Oventrop distribution manifolds and Viega emergency drains were used.

Volodarskoe highway, KP "Orlov", private house with an area of ​​320 m2


Technical task:

To provide heat to a townhouse located in the Orlov cottage village, to supply and install boiler equipment, a radiator heating system and water-heated floors.

Result:

As a heat source we use a floor-standing gas condensing boiler Buderus Logano plus GB102

power 42 kW, indirect heating boiler Huch EnTec, volume 200 l, pumping and mixing groups, manifold, hydraulic separator from the same German manufacturer. The radiator heating system is represented by Rifar bimetallic sectional radiators, Rehau Rautitan pink floor heating pipe with a diameter of 20 mm, for more efficient and uniform heating of the surface in the form of tiles or laminate. A feature of this system is the increased efficiency of a floor-standing condensing boiler, as well as its low weight and relatively small size, as well as the diameter of the chimney compared to traditional atmospheric boilers of any manufacturer.

Rublevo-Uspenskoe highway, KP "Uspensky Forest", estate complex with a swimming pool and hammam


Technical task:

Complete set and installation of heating, water supply and sewerage systems in an estate with an area of ​​more than 1500 m2.

Result:

Buderus Logano G334 WS was chosen as the basis for the boiler room

each with a power of 135 kW, the total system power is 270 kW.
Cascade automatic control Buderus Logamatic 4321
and
Buderus Logamatic 4322
allows you to control six heating circuits + a hot water circuit; an indirect heating boiler
Buderus Logalux SU1000
, providing hot water to 11 bathrooms, a shower room, a laundry room and a hammam. We used floor pump groups and a manifold from the German manufacturer Meibes V-UK and M-MK with mixers, a Watts hydraulic pump and other components from leading European manufacturers. The boiler piping is made of ferrous metal, a twin chimney made of Rosinox stainless steel is installed. Radiator heating is implemented using products from various manufacturers: at the moment we have installed 48 bimetallic 10-section Rommer radiators, 18 steel tubular radiators Arbonia, we have also prepared places and “looped” terminals for the subsequent installation of Varmann floor convectors. The wiring and system of water heated floors throughout the house is made using several types of pipes, incl. Rehau rautitan Stabil, Pink and Rautherm S, Oventrop shut-off valves were used, Grota manifold cabinets were installed, TECE installations were installed in the bathrooms.

Installation prices

Installation prices
Name of work performedPrice
Engineer visit to the site (within a small concrete ring, A107)For free
Installation of a wall-mounted boiler (including commissioning and installation of a chimney into the wall)15000
Installation of a floor-standing boiler up to 60 kW20000
Installation of a boiler up to 200 l.8500
Installation of a 250-500l boiler.12500
Installation of a wall heating comb2500
Installation of the pump group1800
Installation of expansion tank (with liner)3200
Strainer installation500

Installation of Buderus heating boilers is a rather complex procedure that requires an integrated approach and strict adherence to certain standards, rules and requirements. A high-quality installation and safe start-up of the heating system directly affects the efficient operation and durability of the boiler. The use of modern technologies, high-quality equipment and reliable tools allows us to produce at the highest level:

  • installation of Buderus gas boilers,
  • installation of Buderus diesel boilers,
  • installation of electric boilers Buderus,
  • installation of solid fuel boilers Buderus.

Simferopol highway, portal car wash "Lespromkhoz"


Technical task:

Implement heating for a portal self-service car wash and provide heated water to six washing stations at any time of the year.

Result:

The boiler room was installed and launched using the Buderus Logano G315 WS

with a power of 170 kW, running on diesel fuel. This unit provides heat and hot water to the portal sink and the adjacent areas. In addition to high-tech automation that controls five heating circuits, the system contains a hydraulic separator, pumping and mixing modules with Grundfos generation G2 pumps, a high-carbon steel manifold, copper piping of the main components and assemblies, as well as shut-off valves from the Italian manufacturer Giacomini.

Leningradskoye Highway, self-service car wash complex “Black Mud”


Technical task:

Provide heating and hot water for a self-service car wash.

Result:

The boiler room was installed and launched in a technical room, at one of the self-service car washes, not far from the village of “Chernaya Gryad” - 33rd km of the Leningradskoye Highway. The heat generator in this case is a floor-mounted pressurized boiler Buderus Logano G215 WS

with a power of 78 kW, it provides heat and hot water to six posts and a utility room in which the equipment is located. To prepare hot water we use a boiler from the Belgian manufacturer ACV of the Comfort Line series. Pumping and mixing modules from the German manufacturer Huch EnTEC ensure continuous circulation of the coolant and supply of hot water to the stations; a 2000-liter buffer tank is installed, which allows accumulating osmosis (prepared water for finishing the car body) and ensuring its uninterrupted supply even when all six stations are operating simultaneously, for quite a long time.

Simferopol highway, self-service car wash complex


Technical task:

Provide a self-service car wash complex with heat and hot water and install an anti-icing system.

Result:

Our company’s specialists have fully equipped and installed a boiler room that supplies heat and hot water to a self-service car wash complex located in the south of the Moscow region. It is based on a floor-mounted pressurized boiler Buderus Logano G215 WS

with a power of 78 kW, it serves as a heat generator for heating the boiler and water heated floors. To control and monitor the system, a weather-dependent controller with an LCD display is installed, which allows for separate control of heating circuits, a burner from the German manufacturer Giersch running on diesel fuel, Huch EnTEC pumping and mixing modules, a Watts safety group and thermomanometers, and a Meibes water-heated floor collector. As a material for installing a water heated floor system, we use Rehau rautitan pink pipe, with a diameter of 20 mm.

Kaluzhskoe highway, KP "Yesenino", boiler room in a private house with an area of ​​350 m2


Technical task:

Installation and piping of a boiler room using a wall-mounted condensing boiler Buderus Logamax plus.

Result:

Buderus Logamax plus GB172i acts as a heat generator for heating a house with an area of ​​350 m2

with a power of 42 kW, an indirect heating boiler
Buderus Logalux SU200
; pumping and mixing modules and a Huch EnTEC hydraulic separator ensure the circulation of coolant through the circuits, Reflex expansion tanks are installed, the piping of the boiler circuit to the distribution manifold is made of Viega copper, then polypropylene, resistant to temperature changes. Ultimately, we get a modern and inexpensive boiler room with increased efficiency, and at the same time made in a single color style, successfully combined with the interior and exterior of the building.

Mytishchi district, KP "Aksakovo", townhouse with an area of ​​320 m2 + bath complex 120 m2


Technical task:

Supply of equipment and a full range of works on heating, water supply and sewerage systems. Also, one of the tasks is to supply heat to the bath complex with an area of ​​120 m2, located at a distance of 30 m from the main building.

Result:

During the work done, our company’s specialists equipped and installed a boiler room based on the Buderus Logano G234

with a power of 55 kW, original automatic control system
Buderus Logamatic 4211

Logalux SU200
is installed for the preparation of hot water supply , coolant circulation through the system is provided by pumping groups and a manifold manufactured by TE-SA, Reflex expansion tanks are installed, piping of the main boiler units and units are made of copper pipes, a chimney made of Jeremias stainless steel is installed. The heating system is represented by bimetallic sectional radiators from Rifar and Varmann convectors. The wiring throughout the house is made with a Rehau Rautitan Stabil pipe; the water supply and sewerage systems, as well as the heating mains supplying heat to the heating devices of the bath complex, are produced by the Swedish manufacturer Uponor.

Setting up and adjusting Buderus boilers

All heating units require regular balancing and adjustment of parameters. In most cases, a full range of such work is performed during boiler servicing. However, there are situations when unscheduled adjustments are required. For example, after an emergency stop, with a decrease in productivity, with repeated errors generated by automation or after upgrading the system.

Our center’s specialists are ready to carry out both one-time adjustments of your heating unit and take it for long-term maintenance. We are authorized to work with the entire Buderus model range, and our craftsmen have all the necessary licenses and certificates.

Boiler adjustment includes activities such as: warming up; checking the chimney and safety automation; control and debugging of the ventilation system, fuel supply and electrical network. We provide an official guarantee for all types of work.

For additional information on all types of services provided by our center, you can call our 24-hour hotline or come to our office.

Novorizhskoe highway, KP "Luzhki", boiler room in a private house with an area of ​​550 m2


Technical task:

Place the boiler equipment in a limited space, connect to a previously installed and narrowed chimney diameter.

Result:

During the installation process, our company’s specialists focused on the convenience of further operation of the boiler equipment. Inflatable boiler Buderus Logano G215 WS

with a power of 78 kW was installed on a horizontal indirect heating boiler
Buderus Logalux L200
, distribution combs with quick-installation pumping groups of the seventh generation Meibes were mounted on the opposite side of the room.
The boiler circuit piping is made of high carbon steel. A Cuenod two-stage gas burner was installed, and a compact Jeremias silencer was installed for greater comfort. The system is controlled by weather-dependent automation Buderus Logamatiс 4211
, with multifunctional modules FM442 integrated into it.

Connection diagrams for Buderus boilers to the boiler

Modern heating equipment is designed in such a way as to simplify the implementation of the main connections of the heating system. Buderus has a so-called quick installation system for this. Its functions are to ensure reliable, safe and accurate connection of nodes. For each gas boiler of one series or another, there are recommended lines of indirect heating boilers. For example, for the Logano G234 series it is optimal to use Logalux ST or Logalux SU tanks. And for Logano G124, the so-called Unit installation is provided, when a horizontal boiler of the Logalux L series is located under the boiler. This ensures, in addition to the convenience of connections, minimizing the length of the boiler heating circuit route and reducing the space requirements.

Task assessment and budgeting

Our engineer carries out all the required measurements and calculations, takes into account the predicted energy consumption, the number of consumers, the number of heating circuits, possible heat losses of the building, and the individual technical features of the heated premises. A layout plan for the main components and assemblies of the boiler equipment is being developed, and the need to purchase additional components for the heating system is being assessed. Based on all the actions described above, an individual estimate and specification are drawn up, in accordance with which the facility is completed and installation/commissioning work is carried out.

Installation and piping of the boiler room

This term refers to all actions necessary to ensure the full functioning of the heating system and the subsequent transportation of coolant to radiators, water-heated floors and other heating devices. There are no universal solutions suitable for absolutely any case, and cannot exist; in each specific case, a specialist performs calculations individually.

Today, piping a boiler room using copper pipes is quite popular, which is quite logical and understandable:

  • Simplicity and reliability of installation. Of the specialized equipment, a specialist only needs a soldering iron and mastery of this tool;
  • Heat resistance. Piping of boiler units and units made with copper provides reliable protection against expansion and deformation of the pipe when it is heated or overheated during the movement of the coolant;
  • Copper actively resists the formation of salt deposits inside the pipeline, so the speed of movement of the coolant is stable throughout the entire operational period of such material. Note that traditionally manufacturers claim a service life of fifty years or more, and with proper installation and soldering - 100 years or more;
  • Good heat transfer from copper - heating of rooms is carried out not only with the help of the radiators themselves, but also due to the movement of the coolant. Copper heats up well and does not require a large amount of thermal energy;
  • Copper is not subject to corrosion. Over time, copper pipes may become coated with a thin layer of oxide, but this does not in any way affect performance;
  • Copper piping is not afraid of freezing. Piping the boiler room with copper pipes eliminates the difficulties associated with freezing of the coolant. In this case, steel and propylene pipes simply burst. Copper is more ductile, so it can withstand freezing loads without losing integrity.

Basic installation steps

The installation technology implies the following sequence:

  • Preparatory work.
  • Placement of fasteners and direct installation of the boiler.
  • Connection to water supply, gas and electrical networks (in that order).
  • Connection to the chimney.
  • Filling the system with water, checking, test run.

Preparation for installation

First of all, the gasification project is approved and implemented: gas is supplied, a ball valve, meter and trap are installed (it is strictly forbidden to do these works yourself; only certified specialists have access). Separate wiring is laid for the power supply, with the obligatory inclusion of a voltage stabilizer in the circuit to protect the automation; provision is also made for providing the wall-mounted boiler with grounding. The presence of all required components is checked and the instructions are studied again. Before starting, the gas boiler, mains and radiators are flushed from debris and foreign particles. These actions are relevant both when commissioning a new system and when replacing a heating device.

Mounting and connecting the boiler

The kit includes a special bracket and clamps; please note that the latter are not always suitable for the wall material; sometimes they are purchased separately. The selection of these parts is extremely important when installing a wall-mounted gas boiler; they must withstand a load exceeding the weight of all equipment. The fasteners are placed parallel to the floor, as level as possible, otherwise the automation will fail. The boiler is hung on the wall, the level is checked and only if there are no distortions is it connected to the heating main. It is planned to dismantle the unit and drain the coolant using appropriate shut-off valves.

Additional equipment and components for the boiler room

Ensuring the highest possible level of safety is as important an aspect of boiler installation as doing the installation correctly. Additional equipment and components help to achieve the highest level of efficiency:

  • Collectors - such equipment contributes to the uniform distribution of coolant heated to the desired temperature along numerous circuits;
  • Sensors for fuel leakage, the appearance of smoke, liquid fuel, stability of working pressure - such devices help to significantly increase the degree of safety, since they are able to promptly signal a danger;
  • Temperature sensors, automation systems - help facilitate the processes of managing the heating system, making it possible to automate the vast majority of technological processes;
  • Shut-off valves - provides the ability to distribute coolant flows within the system depending on the user’s wishes;
  • Quick installation groups are a ready-made heat distributor along circuits, which can be correctly installed in the boiler room, connected to the boiler and to the heating system, water heated floors, boiler and power supply;
  • Hydraulic separator - necessary for hydrodynamic balancing of the heating system and serves as an additional unit. This device makes it possible to protect boiler heat exchangers made of cast iron from possible thermal shocks.

To combine all of the above elements into a single operating system, you will need to use the services of several specialists with many years of practical experience in the configuration and installation of boiler rooms and heating systems. By contacting us, you make the right choice!

Features of the service

Proper installation of the Buderus boiler is the key to its long and uninterrupted operation. The heating equipment will operate stably and will not cause an emergency. You can use it to heat the property or also to obtain hot water (if you install a dual-circuit model).

Installation is carried out by experienced specialists in the shortest possible time. They take into account both customer requests and all manufacturer recommendations, and are guided by established standards. Our field crews have everything they need for installation. Our specialists have modern tools and components to make the operation of the boiler as comfortable and safe as possible.

The installation package includes:

  1. Boiler placement.
  2. Supply of fuel supply systems to it.
  3. Connection to heating system, etc.

Additionally, you can use the heating system design service. Our specialists will develop the right project for you.